Latest Updates

2020 Update to Council

Staff prepared an Information Report for City Council in March 2020 on the status of this project, discussing the work to date, developments since the start of this Class EA and next steps.

Visual Design Guidelines - Final Draft

Residents are invited to view the final draft of the proposed visual design guidelines for Highway 15, prepared in conjunction with the Municipal Class Environmental Assessment by the Planning department.

Preliminary Designs

Click on the preliminary design images for a larger view.

Highway 2
Highway 2 - Fort Henry Drive to Niagara Park Drive

Highway 15 - Area 1
Highway 15 - Highway 2 to Gore Road

Highway 15 - Section 4
Highway 15 - Gore Road to John Marks Avenue

Highway 15 - Section 5
Highway 15 - John Marks Avenue to Highway 401


Project Phases

This Study commenced in the Fall of 2015 following recommendations in the Kingston Transportation Master Plan (KTMP) to examine roadway improvements on Highway 15 due to growth. The Study is carried out in accordance with the Municipal Engineers Association, Municipal Class Environmental Assessment (October 2000, as amended in 2007, 2011 and 2015).

Phase 1: Needs Assessment - involved the identification and evaluation of existing and future needs of the transportation network with respect to network capacity, traffic safety, and design and operations. The purpose of the Needs Assessment was to identify and define:

  • Existing and future capacity, safety, and operational deficiencies and opportunities along Highway 15, from south of Highway 401 to Highway 2
  • Existing and planned transit and active transportation facilities in the corridor and opportunities to improve connectivity and encourage a multi-modal transportation network
  • Existing conditions with respect to socio-economic environment, archaeology and cultural heritage, geotechnical engineering, natural environment, hydrogeology and stormwater management, and structural engineering
  • A problem and opportunity statement

Notice of Study Commencement was issued in September 2015.

Phase 2: Alternative Solutions - summarized the alternative solutions assessed and evaluation criteria used to address existing deficiencies and accommodate future needs. At the end of this phase a preferred planning solution was advanced for possible preliminary designs.

A public Open House occurred in November 2015 to review and collect input regarding Phases 1 and 2 of the Study.

Phase 3: Preferred Solution - included the identification and evaluation of alternative design concepts for the preferred planning solution. A preferred design concept was selected and the impacts of the design on the natural, social and economic environment were identified and measures to mitigate these impacts were completed.

Public Open Houses were held in June 2016 and March 2017 to review the preferred design solution and alternative design concepts.

Phase 4: Environmental Study Report - is the completion of an Environmental Study Report (ESR) which summarizes the entirety of the project work in support of the preferred design concept. Prior to finalizing the ESR for the approval of the Ministry of Environment, Conservation and Parks (MECP), the recommendations of the ESR will be presented to City Council for approval to proceed with Notice of Project Completion and submission to MECP.

Future Phases

Phase 5 of the Class EA process is implementation of the ESR. Subject to the approval of City Council and the MECP, this includes detailed investigations as recommended in the ESR, detailed design and construction. Detailed work is not scheduled until completion of Phase 4 for the Class EA process.

^ Top


Project News

Asset Publisher

The City of Kingston is releasing the final design of Highway 15 and Gore Rd intersection providing residents an opportunity to review the future desi ...
The City of Kingston is seeking your input on the renaming of the City-owned portion of Highway 15 between Highway 2 and Highway 401 during an upcom ...
Attention east-enders: the City of Kingston has completed the final draft of its design guidelines for Highway 15 from Highway 2 to Highway 401 and ...
Come to the final open house on the Highway 15 Municipal Class Environmental Assessment (EA) and offer input on recommendations for walking, cycling ...