Action Plan - Phase II & III

Nested Applications

Image - Projects Construction - Third Crossing

Content - City Hall - Project - Third Crossing Icons

Content - City Hall - Projects - Third Crossing - Action Plan

Final documents

Third Crossing Public Engagement Feedback Report (Exhibit A to Council Report 17-177)

Third Crossing Public Engagement Feedback Report 

Public engagement
feedback report



Final Third Crossing Preliminary Design Summary Report (Exhibit B to Council Report 17-177)

Final Preliminary Design Summary Report 

Part -1
Part -2

 

Text only

 

Preliminary design drawings

  Public comments for draft preliminary design report

Appendices

A - Sustainability Charrette Feedback Report - Feedback Report on a charrette focusing on available sustainable design, construction and operations options for the bridge.

Appendix A

B - Parks Canada Detailed Impact Analysis (DIA) Scoping Document - Scoping guidelines for the Preparation, Construction, Restoration, and Operation of the Third Crossing.

Appendix B

C - Natural Environment Assessment Report - Assesses natural heritage features within the bridge corridor as well as project impacts and mitigation measures.

Appendix C

D - Cultural Heritage Protection and Enhancement Plan Report - Assesses cultural heritage features within the bridge corridor as well as project impacts and mitigation measures.

Appendix D 

E - Phase I Environmental Site Assessment Report - Identifies former or current practices within the bridge corridor that may present issues of actual or potential environmental concern.

Appendix E

F - Excess Soil and Sediment Management Report - Describes soil and sediment sampling fieldwork results within the bridge corridor.

Appendix F

G - Preliminary Geotechnical Investigation Factual Data Report - Describes geotechnical fieldwork results within the bridge corridor.

Appendix G

H - Preliminary Geotechnical Investigation Design Report - Describes engineering design guidelines for the bridge, based on the geotechnical fieldwork.

Appendix H

I - Preliminary Geotechnical Investigation Design Addendum Report - Describes engineering design guidelines for the bridge, based on the geotechnical fieldwork and refined inverted U-frame pier design.

Appendix I

J - Stormwater Management Report - Describes storm water management provisions for bridge runoff and the approaches.

Appendix J

K - Natural Heritage Protection and Enhancement Plan Report - Identifies project impacts as well as mitigation, restoration and enhancement measures for the bridge corridor.

Appendix K

L - Transportation Noise Assessment Report - Assesses effects of transportation noise on sensitive receptors within the bridge corridor and mitigation measures.

Appendix L

M - In-Air Noise Impact Assessment Report for Birds and Reptiles - Assesses in-air effects of impact pile driving during bridge construction and transportation noise during bridge operations on birds and reptiles.

Appendix M

N - Underwater Noise Modelling Report of Impact Pile Driving - Assesses underwater effects of impact pile driving during bridge construction on fish, turtles, fish eggs and fish larvae.

Appendix N

O Carbon Life Cycle Assessment (LCA)  - Describes the scope, inputs, analysis, and output of a preliminary, planning level LCA for the construction phase of the bridge.

Appendix O



Final Third Crossing Business Plan Report (Exhibit C to Council Report 17-177)

Final Third Crossing Business Plan Report 

Final business plan

 

Public comments for draft business plan

Appendices

A - Third Crossing Transportation Forecasting and Analysis Traffic Report - Summary of traffic information and analysis to inform the Business Plan

Appendix A

B - Third Crossing Cost-Benefit and Economic Impact Analysis Report

Appendix B

 


Draft documents

Draft Third Crossing Business Plan Report

Draft Third Crossing Business Plan Report 

Draft Business Plan

Appendices

A - Third Crossing Transportation Forecasting and Analysis Traffic Report - Summary of traffic information and analysis to inform the Business Plan

Appendix A

B - Third Crossing Cost-Benefit and Economic Impact Analysis Report

Appendix B

Draft Third Crossing Preliminary Design Summary Report 

Draft Preliminary Design Summary Report 

Part -1
Part -2

 

Text only

 

Preliminary design drawings

Appendices

A - Sustainability Charrette Feedback Report - Feedback Report on a charrette focusing on available sustainable design, construction and operations options for the bridge.

Appendix A

B - Parks Canada Detailed Impact Analysis (DIA) Scoping Document - Scoping guidelines for the Preparation, Construction, Restoration, and Operation of the Third Crossing.

Appendix B

C - Natural Environment Assessment Report - Assesses natural heritage features within the bridge corridor as well as project impacts and mitigation measures.

Appendix C

D - Cultural Heritage Protection and Enhancement Plan Report - Assesses cultural heritage features within the bridge corridor as well as project impacts and mitigation measures.

Appendix D 

E - Phase I Environmental Site Assessment Report - Identifies former or current practices within the bridge corridor that may present issues of actual or potential environmental concern.

Appendix E

F - Excess Soil and Sediment Management Report - Describes soil and sediment sampling fieldwork results within the bridge corridor.

Appendix F

G - Preliminary Geotechnical Investigation Factual Data Report - Describes geotechnical fieldwork results within the bridge corridor.

Appendix G

H - Preliminary Geotechnical Investigation Design Report - Describes engineering design guidelines for the bridge, based on the geotechnical fieldwork.

Appendix H

I - Preliminary Geotechnical Investigation Design Addendum Report - Describes engineering design guidelines for the bridge, based on the geotechnical fieldwork and refined inverted U-frame pier design.

Appendix I

J - Stormwater Management Report - Describes storm water management provisions for bridge runoff and the approaches.

Appendix J

K - Natural Heritage Protection and Enhancement Plan Report - Identifies project impacts as well as mitigation, restoration and enhancement measures for the bridge corridor.

Appendix K

L - Transportation Noise Assessment Report - Assesses effects of transportation noise on sensitive receptors within the bridge corridor and mitigation measures.

Appendix L

M - In-Air Noise Impact Assessment Report for Birds and Reptiles - Assesses in-air effects of impact pile driving during bridge construction and transportation noise during bridge operations on birds and reptiles.

Appendix M

N - Underwater Noise Modelling Report of Impact Pile Driving - Assesses underwater effects of impact pile driving during bridge construction on fish, turtles, fish eggs and fish larvae.

Appendix N

O Carbon Life Cycle Assessment (LCA)  - Describes the scope, inputs, analysis, and output of a preliminary, planning level LCA for the construction phase of the bridge.

Appendix O